Latest Projects
PROTOS Deep Excavation
Live monitoring of the construction of a deep excavation in Ince, UK
- Sheet pile wall deflections and bending moments
- Prop loads
- Bunker wall strains
- TBM performance measurements
- Real-time feedback on the FOCUS platform: https://platform.dcu-group.co.uk/
Lake District Microtunnelling
Live monitoring of the construction of a 1200 m pipe-jacked tunnel in mudstone at Keswick, UK using a ‘smart’ pipe
- Shear and normal soil-structure contact stresses
- Lubricant pressures at the soil-structure interface
- Pipe wall strains
- TBM performance measurements
- Real-time feedback to site engineers
Putney Microtunnelling
Live monitoring of the construction of a pipe-jacked tunnel at Putney Bridge as part of the Thames Tideway Tunnel construction works in London Clay using a ‘smart’ pipe
- Lubricant pressures at the soil-structure interface
- Pipe wall strains
- TBM performance measurements
- Real-time feedback to site engineers
Anchorsholme Caisson
Live monitoring of the construction of a 32 m internal diameter (20 m deep) caisson in dense sand at Blackpool, UK
- Caisson settlement & tilt during sinking
- Shear and normal soil-structure contact stresses
- Lubricant pressures at the soil-structure interface
- Caisson wall strains
- Video monitoring of construction phases
- Real-time feedback using site tablets
Sloway Caisson
Live monitoring of the construction of an 11 m internal diameter caisson in soft clay at Bridgewater, UK
- Caisson settlement & tilt during sinking
- Shear and normal soil-structure contact stresses
- Lubricant pressures at the soil-structure interface
- Video monitoring of construction phases
- Real-time feedback using site tablets
Putney Caisson
Live monitoring of the construction of a 6 m internal diameter caisson (41 m deep) in London Clay at Putney Bridge as part of the Thames Tideway Tunnel construction works
- Caisson settlement & tilt during sinking
- Lubricant pressures at the soil-structure interface
Lennox Gate Caisson
Live monitoring of the construction of a 25 m internal diameter caisson in dense sand at Blackpool, UK
- Caisson settlement & tilt during sinking
- Video monitoring of construction phases
- Real-time feedback using site tablets